From an Electric Railway Proposal to an Operating Company

At the end of the nineteenth century, much of Berlin’s public transport still relied on horse-drawn vehicles and street trams. Siemens & Halske promoted an electric elevated and underground railway that would let trains bypass congestion. Introducing steel viaducts into densely built streets also provoked arguments over their appearance, obstruction and effects on residents, making the use of urban space part of the railway’s design.

Construction of the main route began on Gitschiner Straße in Kreuzberg in September 1896. Siemens & Halske organized the work and, with Deutsche Bank’s support, established the electric elevated and underground railway company in April 1897 to finance and operate it. The route crossed Berlin, then-independent Charlottenburg and other municipalities, requiring negotiations over alignments, land and revenue.

References: [1] [2]

Why the Western Section Went Underground

Most of the early main route ran on steel viaducts. Charlottenburg insisted that the section toward Zoologischer Garten should run underground to reduce its impact on the streetscape. Near Nollendorfplatz, trains descended from the elevated railway into a tunnel; the Potsdamer Platz branch also ended at an underground station. Elevated and underground construction thus served the same electric railway.

Tunnelling had to accommodate existing water and sewer networks, while route planning affected roads and land use. Above ground, relatively light steel trusses and frames supported the trains, balancing structural capacity with openness at street level. Tracks, power equipment, bridges and stations formed a transport system whose architecture and engineering developed together.

References: [1] [2]

The Staged Opening of 1902

A special inaugural journey for invited political and public figures took place on 15 February 1902. Passenger service began on 18 February between Stralauer Tor and Potsdamer Platz via Gleisdreieck. The western section from Potsdamer Platz to Zoologischer Garten entered service on 11 March, and direct east–west trains bypassing the Potsdamer Platz branch followed on 25 March.

These sections formed an early branched network. The routes from Gleisdreieck toward Potsdamer Platz and Zoologischer Garten became core sections of the later U2, while the eastern route toward Stralauer Tor became part of other lines. Elevated structures and tunnels separated electric trains from street traffic, and stations such as Zoologischer Garten connected passengers with the wider railway network.

References: [1] [2]

Extensions and the Reconstruction of Gleisdreieck

The route gradually developed into a line crossing the city centre. The eastern extension reached Spittelmarkt in 1908 and continued through Alexanderplatz to Schönhauser Allee in 1913. In the west, it extended through Charlottenburg toward the stadium and reached Ruhleben in 1929. The northeastern end reached the station then called Pankow, on Vinetastraße, in 1930.

Expansion exposed weaknesses in the original junction. A serious collision at Gleisdreieck killed eighteen people in 1908. Its level triangular junction was subsequently replaced with a station incorporating grade-separated crossings, which opened in 1912. Stations also changed: the old Potsdamer Platz terminus made way for an extension toward the centre, while station buildings, branches and operating arrangements evolved with demand.

References: [2]

Disused Sections in a Divided City

After the Berlin Wall was built in 1961, the connection across the boundary near Potsdamer Platz was severed. The western elevated section lost its through route and passenger numbers declined. Service between Wittenbergplatz and Gleisdreieck, via Nollendorfplatz and Bülowstraße, ended on 31 December 1971. Disused elevated stations later housed markets and restaurants, while some tracks carried museum trams or a magnetic-levitation experiment.

Line numbers changed along with the operating network. When West Berlin adopted numerical designations in 1966, line 2 ran between Gleisdreieck and Krumme Lanke; the western section of today’s U2 then belonged to line 1. From 1972, the western line 2 ran only between Wittenbergplatz and Krumme Lanke. Restoring the connection through the centre required another reorganization of numbers and train routes.

References: [2]

Reconnecting the Route and Its Operations

The interrupted central connection reopened on 13 November 1993, restoring U2 service between Vinetastraße and Ruhleben. Reconnection required clearing temporary uses from the viaducts, preparing equipment and arranging rolling stock for the reunited line. Shortly after reopening, operating problems led BVG to replace some GI trains with A3 stock and shorten some train formations.

On 16 September 2000, the line extended one more stop from Vinetastraße to Pankow. Northeastern residential areas, Alexanderplatz, Potsdamer Platz, Zoologischer Garten and Ruhleben were now joined by one route. The works of 1902 supplied important foundations, but the cross-city line took almost a century of extensions, reconstruction and reconnection to develop.