Two agreements for one system

INTELSAT began as an international consortium established in 1964. Countries seeking greater telecommunications capacity through satellites had to resolve funding, management, access and procurement. Negotiations produced an intergovernmental interim agreement and a special agreement governing commercial, financial and technical operations.

Both opened for signature and began taking effect on 20 August. Governments signed the first and signed the second themselves or designated public or private telecommunications bodies to do so. The consortium connected commitments between states with investment responsibilities of operating organizations. The U.S. report on 1965 space activities records eleven initial signatories to the intergovernmental agreement, nineteen participating countries by the end of 1964 and forty-eight by the end of 1965.

References: [1] [3]

A committee and an American manager

The Interim Communications Satellite Committee oversaw design, construction, operation and maintenance of the space segment, including satellites and supporting tracking, control and command facilities. COMSAT served as manager under the committee’s general policies and specific decisions, handling annual plans, budgets, procurement proposals and operational affairs.

Seats and voting power followed investment shares. A signatory holding at least 1.5 percent, or a group reaching that share collectively, could appoint a representative. The committee sought unanimity and otherwise voted under prescribed rules. Major budgets, significant contracts and similar matters required affirmative votes exceeding the largest single representative’s votes by at least 12.5 percentage points. Even with the largest share, the American participant needed support from others.

References: [1] [2]

Costs, ownership and access

The interim agreement used two hundred million dollars as the estimated construction cost of the space segment. Initial shares in the Special Agreement’s annex included COMSAT at sixty-one percent, Britain at 8.4 percent, France and West Germany at 6.1 percent each, Canada at 3.75 percent and Japan at two percent. Signatories paid according to their shares and held undivided joint ownership of the space segment.

Funds were called in stages to meet project expenditure, payable in dollars or freely convertible currency. The committee set usage charges intended to cover capital amortization, compensation for capital use, operations, maintenance and administration. Earth stations needed technical approval considering performance, multiple-station access, geographical distribution and relevant International Telecommunication Union recommendations. Investment commitments and approved access were separate requirements.

References: [1] [2]

Cooperation through procurement procedures

Equipment design, development and procurement contracts expected to exceed five hundred thousand dollars required committee approval. The manager had to supply information necessary for members’ duties and involve technical staff recommended by participating countries in evaluation of designs and specifications. When quality, price and delivery conditions were comparable, procurement should broadly reflect participants’ shares. Joint oversight therefore operated through contracts, accounts and engineering review.

References: [1] [2]

Early Bird begins transatlantic service

Early Bird, launched on 6 April 1965, supplied the first operating result. In an equatorial synchronous orbit over the Atlantic, it offered 240 telephone channels. Earth links included Andover, Maine, and stations in Britain, France, West Germany and Italy. Regular commercial service between North America and Western Europe began on 28 June 1965, carrying telephone, record communications and television.

National regulation also shaped services. The U.S. Federal Communications Commission allowed tariffs to take effect while investigating their reasonableness, requiring related revenues to be recorded as deferred credits pending its findings. Orbital facilities, earth stations, telecommunications providers and domestic regulators together formed the communications chain used by customers.

References: [3]

Replacing the interim framework

The 1964 agreements required consideration of permanent arrangements. Alongside continuing engineering and operations, the interim committee examined whether to create a permanent organization with an assembly and international administrative and technical staff. Operating capacity developed while governance and participation remained under discussion.

A new agreement opened for signature on 20 August 1971 and entered into force on 12 February 1973. It formally established INTELSAT with legal personality, an Assembly of Parties, Meeting of Signatories, Board of Governors and executive organ. The 1964 consortium, regular services in 1965 and the permanent framework in 1973 marked distinct stages of cooperation, communications and institutional organization.

References: [1] [3] [4]