Which Section Opened in 1890?
The Northern line of the London Underground took shape through construction, connections, and extensions undertaken by different companies. Its starting point in 1890 was the City and South London Railway, running from King William Street in the City beneath the Thames to Stockwell on the south bank.
The National Heritage List for England's descriptions of associated stations distinguish this railway from the Charing Cross, Euston and Hampstead Railway, which opened in 1907. The two were connected during the 1920s and adopted the Northern line name in 1937.
Authorization, the Company, and Construction Contracts
In his technical report published in 1896, engineer James Henry Greathead attributed the project's origins to slow travel within London and growing population and transport demand. Initially called the City and Southwark Subway, the project obtained parliamentary authorization in 1884 to connect King William Street with Elephant and Castle. The company became ready to start work only in 1886, and in 1887 received permission to extend to Stockwell.
C. G. Mott chaired the company, and Edmund Gabbutt contracted for the initial works. Walter Scott & Company built the Stockwell extension. Passenger lifts and hydraulic machinery were entrusted to Armstrong, Mitchell & Company, while Mather & Platt received the electrical-equipment contract in 1889.
The legislation prohibited steam locomotives, and the initial design contemplated continuous cable haulage. Greathead explained that advances in electric traction during construction led the company to choose electricity instead. The small-diameter tunnels were linked to the original traction concept: the two sections had diameters of approximately ten feet two inches and ten feet six inches respectively, and rolling stock had to fit these profiles.
References: [1]
Tunnels Beneath the River and Work on Site
Construction first tackled the river crossing, the section regarded with the greatest doubt. Behind Old Swan Pier near London Bridge, the contractors installed a temporary platform and shaft in the river and began the first tunnel in October 1886. Both river tunnels were complete by June 1887. Trains in opposite directions used separate bores, and most of the route followed public streets underground to reduce difficulties associated with crossing private property.
Shield tunneling was not fast at first. Greathead recorded an advance of only twenty-three feet during the initial two weeks. Progress improved substantially as workers became familiar with the machinery and tools were refined. Station shafts also served as construction entrances, allowing excavation from multiple faces.
The northward drive encountered a major influx of water. The contractors closed the shield's front, installed a bulkhead and airlock, and continued under compressed air, returning to normal atmospheric pressure after reaching clay again. Excavated material traveled through the tunnels to the river shaft and was removed by barge, reducing the burden of carting spoil through City streets.
A deep railway still needed to bring passengers to its platforms. Stations used hydraulic lifts powered by a pumping system at Stockwell and retained stairways. Ventilation exploited the air movement caused by trains in separate tunnels, with connecting passages regulating airflow.
References: [1]
The Ceremony and Public Operation
The Prince of Wales attended the opening ceremony on November 4, 1890, but public passenger service began on December 18. Greathead explicitly gives both dates. The Financial Times report published the following day likewise stressed the interval between the royal ride and opening to ordinary passengers.
The reporter entered at King William Street, paid two pence at a turnstile, and took a lift to the platform. He described longitudinal seating and no fare-class divisions, although smoking and nonsmoking spaces were distinguished. Passengers depended mainly on staff to identify stations. Electric lighting and the absence of sulfurous smoke from steam locomotives sharply differentiated the new transport from other underground railways of the period.
The report gave a journey time of about fifteen minutes from King William Street to Stockwell, with trains roughly every five minutes that day and heavy passenger traffic. One train also stopped in a tunnel for approximately fifteen minutes.
The scale of operation subsequently expanded. Greathead recorded about 2.412 million passenger journeys in the first six months and 6.9 million in 1894.
Connections and Equipment Renewal
The Hampstead Railway, another component of the Northern line, opened on June 22, 1907, branching at Camden Town toward Golders Green and Highgate. Its construction was promoted by the Underground Electric Railways Company of London, organized by Charles Tyson Yerkes. He died in 1905 and did not see the opening. Connections made between 1924 and 1926 gradually integrated the two formerly separate systems.
Piers Connor's engineering history notes that postwar modernization included not only connecting routes and extending south to Morden but also enlarging the original tunnels and buying new trains. Door arrangements changed with passenger demands: Standard Stock trailer cars used wider double doors to increase boarding and alighting capacity.
Station Heritage and New Extensions
Early construction left a recognizable station landscape. Designed by Leslie Green, Belsize Park station's red glazed exterior reflects the standardized architectural identity of the period. In 2011, it and associated walls, railings, and other features received Grade II listing.
The Northern line also continued to provide new urban connections. Transport for London's 2021/22 annual report records that the new Nine Elms and Battersea Power Station stations welcomed passengers on September 20, 2021, both with step-free access.